
WPC Decking for the Czech Republic — Factory Direct
BOHAI is the manufacturer, not a trading house. We extrude WPC composite decking on our own lines in Sihui, Zhaoqing, Guangdong, using dies we own and maintain in-house. Standard production is approximately 2,000 tonnes a month, and a batch test report travels with every shipment. For buyers comparing composite decking manufacturers for Czechia, BOHAI is a direct factory option rather than an intermediary.
The Czech market already has domestic WPC manufacturers, installers and stocked retail ranges. That means an imported board must earn its place. For distributors searching WPC terasy, the commercial question is not whether composite decking exists locally; it is whether factory-direct profiles, private-label control, colour planning and a 70 m² minimum order create a range the local stock market does not already provide.
Because the Czech Republic is landlocked, a quotation needs two route decisions: the seaport and the inland terminal. Hamburg with rail to Prague is an established corridor, while other North Sea or Adriatic gateways can be compared when the live carrier schedule, terminal connection and final warehouse location support them.
Your WPC Decking Manufacturer and Supplier for Czechia

- ✓Factory direct — not a trading company
- ✓Port and inland terminal priced separately
- ✓Private-label and distributor stock planning
- ✓Documents tied to the named profile
- ✓MOQ 70 m² — one real project
- ✓Capped and classic decking ranges
- ✓Unit price within 24 hours
- ✓Batch report with every shipment
Specification guides: Profiles, sections and metre weights · Roof terraces on adjustable pedestals · How to tell a real WPC factory from a trader
We also write for: Germany · the Netherlands · Belgium · Ireland · Poland · France · Spain · Italy · Greece · Austria · Switzerland · Sweden · Slovenia · Croatia · Slovakia
A Landlocked Import Has Two Route Decisions
For a Czech buyer, choosing the seaport is only the first half of the route. The inland terminal and final warehouse can change the answer.
Hamburg to Prague is the reference corridor
Hamburg is Europe’s largest rail port, and Prague is a major METRANS hub. It is the first route worth pricing for many Czech importers because the seaport and inland rail leg are already part of a mature intermodal network. The live sailing, rail departure and terminal charges still have to be confirmed for each quotation.
The nearest-looking port is not always the lowest landed route
Bremerhaven, Rotterdam, Antwerp, Gdańsk, Koper or Trieste may become relevant depending on carrier service, inland capacity and the buyer’s location. Compare seaport handling, rail or road, terminal storage and final delivery together. A low ocean rate can be erased by the inland leg.
Choose the Czech terminal before the boards are packed
Prague, Česká Třebová, Ústí nad Labem, Plzeň, Zlín and Ostrava sit in established intermodal networks. The selected terminal affects final road kilometres, pallet handling and warehouse planning. Tell us the destination and unloading equipment before production, not after the container reaches Europe.
The Decking Range
Capped co-extrusion and classic uncapped, hollow and solid. Six sections that cover most distributor and project briefs.






Four Czech Buying and Installation Conditions
The Czech Republic is compact, but a Prague roof terrace, a Moravian dealer warehouse and a mountain hotel are different briefs.
Prague roofs, balconies and courtyards
Available build-up height, waterproofing and drainage outlets usually control the section. If the membrane cannot be penetrated, send the threshold height and load limits before the system is chosen. A board profile cannot solve an incorrectly designed roof build-up.
Dealer stock in Bohemia and Moravia
A distributor needs a range that can be replenished and explained: a small number of profile-colour combinations, matching clips and trims, retained batch spares and samples that show the cap and core. Too many colours split stock and slow sell-through.
Mountain and upland hospitality
Krkonoše, Šumava and other higher sites add snow, freeze–thaw and long wet periods. Snow load belongs to the support structure. Drainage must remain open during thaw, and cleaning practices should not damage the cap or metal connectors.
Commercial terraces and public-facing projects
Restaurants, spas and municipal spaces need the requested evidence named before a product is promised. Slip method, fire classification, profile scope and installation drawing should be checked as separate items rather than hidden under the word “certified”.
What the Board Is Made Of, and What the Surface Does
The specification starts with the construction, not the colour name.
60% wood powder, 30% HDPE, 10% additives

On the capped range a co-extruded polymer shield wraps the WPC core. The shield is the wearing layer and carries the fade, stain and scratch resistance. Classic boards are uncapped, which lowers cost but changes the cleaning and weathering expectations.
Sections and textures are separate decisions

A complete specification names the range, profile, surface texture and colour. The full profile schedule is on the models page. Do not carry a span or metre weight from one section to another simply because the face width looks similar.
The gaps are working parts of the deck
Side and end gaps allow thermal movement and carry water off the face. They are not cosmetic tolerances. On exposed roof terraces or cold inland projects, blocked gaps turn rain and trapped water into standing water; on a long summer terrace, missing end gaps can turn expansion into buckling.
Colours — Three Ranges
Colour and texture are selected independently from the profile.
The full colour card

Capped co-extrusion: Teak, Antique, Redwood, IPE, Light-grey, Walnut.
Classic uncapped: Teak, Redwood, Walnut, Coffee, Chocolate, Ebony.
3D embossing: Teak, Red Wood, Walnut, Chocolate, Light Grey, Dark Grey.
Judge the sample where the project will be built
Warm urban courtyards, shaded gardens and mountain hospitality sites do not read the same colour the same way. Put the physical sample outdoors at the project and compare it in sun and shade. Dark exterior surfaces absorb more heat, so a colour approved under showroom lighting can behave differently on a south-facing Czech terrace.
Order the whole visible area in one batch
Pigment is mixed into the extrusion run, so separate batches of the same named colour are not identical. Order one visible area together and keep spare boards from that batch. This matters on hotels and spa projects installed in stages.
Where WPC Terasy Go in the Czech Market
Local demand spans retail terraces, hospitality, pool areas and distributor stock programmes.
Family terraces and garden projects
The sales decision is usually colour, surface, installed price and confidence in the local installer. A distributor should stock complete systems rather than boards alone: starter clips, hidden clips, joists, trims and spare boards from the same batch.
Prague hospitality and roof terraces
Restaurants and hotels need predictable cleaning, documented surface performance and details that respect the roof membrane. Send threshold heights, drainage points and traffic expectations before recommending a section.
Pools, spas and wellness projects
Wet use makes the test method decisive. Our published R10 result is a shod wet ramp result on one named profile; it is not a barefoot pool classification and should not be extended to the full range.
Regional dealers and installation partners
Czech buyers already expect samples, installation advice and local availability. The importer’s value is created after the container arrives: coherent stock, Czech-language sales material, trained installers and a clear claims process.
Installation and Accessories
Put these details on the drawing before the frame is built.
Gaps and double joists

5–7 mm between adjacent board sides, about 5 mm at a wall, and 3–5 mm at butt joints are the catalogue starting points. Butt joints sit on double joists so each board end has its own support. Final spacing and support centres must match the exact profile and project conditions.
Accessories, with sizes

The system includes starter clips, plastic hidden clips, expansion screws, 50 × 50 × 3000 mm corner trim, 40 × 30 × 3000 mm WPC joist and 40 × 25 × 2900 mm aluminium joist. Fixings and exposed metals still need to suit winter de-icing salt, pool chemicals or other project-specific exposure.
Ask About a Specific Profile
Send the profile, area, Czech delivery terminal or warehouse, and required stock date.
A real specification before a real price
Send the profile, colour, area, destination and whether this is project supply or dealer stock. We reply with a per-unit price, the applicable documents and a route structure.
What Owning the Line Gives You
Capacity you can book against
Approximate production capacity is 2,000 tonnes a month. Send the volume and required arrival date; we answer with a production slot rather than treating lead time as a slogan.
Dies are ours
We own and cut the tooling used on our extrusion lines. That permits market-specific sections and gives us direct control over dimensional checks and repeat production.
A batch report travels with the goods
Routine checks are recorded before dispatch and the report travels with the shipment. Keep it with the commercial documents; it is often the first document requested on a public or hospitality project.
Certification: What We Hold, and the Exact Scope
Ask for the document itself and read the profile named on it.
| Item | Status | Scope |
|---|---|---|
| CE marking / CPR | Held, scoped | Certificate M.2024.206.C97619, UDEM, valid to 11 March 2029; issued against EN 15534-1:2014+A1:2017 and EN 14041:2018 for the named decking profiles. Ask before assuming it covers another profile. |
| Declaration of Performance | Available by profile | The reaction-to-fire declaration belongs on the DoP for the profile being quoted. It is not created by copying a class from another board. |
| Slip resistance | R10, scoped | Intertek report 230625005SHF-001 under AS 4586-2013 Appendix D, measured on profile ZSGJ138H23A. It is a shod wet ramp result, not a barefoot pool classification. |
| ASTM E84 | Held, scoped | Class A result on a named 138 × 23 mm board. This is a US test method and does not replace the European classification required for a Czech project. |
| ISO 9001 / ISO 14001 | Held | Quality and environmental management certificates valid to April 2027. |
| Tests not held | State the gap | Where a tender asks for a method or profile outside the existing evidence, testing can be discussed before quotation. We do not relabel another method as an equivalent. |
What We Do for a Czech Distributor
A first order can be smaller than a container
The minimum order is 70 m². That lets a Czech distributor test one profile, colour, route and documentation pack on a real project before committing to broad warehouse stock.
Samples show the construction, not only the colour
Samples are free; you cover the courier and we credit it against the first order. Ask for a sawn piece so the cap, core and chamber geometry are visible. Compare it with the local products your customer already knows.
A per-unit quotation within 24 hours
Send profile, colour, quantity, destination, business model and required date. We return a unit price and identify the technical documents applying to that exact section.
Private label without pretending to be local stock
OEM packaging, colour programmes and market-specific sections can be discussed. Factory-direct supply is for planned stock or projects; it should not be marketed as the same thing as next-day Czech warehouse availability.
Czech Republic: Port, Terminal and Terms
The current carrier and rail plan is confirmed at quotation. This table defines the decisions, not a permanent timetable.
| Item | Detail |
|---|---|
| Port of loading | Nansha or Yantian, Guangdong |
| Reference seaport route | Hamburg, with the Czech inland rail leg priced to the selected terminal. |
| Other seaports to compare | Bremerhaven, Rotterdam, Antwerp, Gdańsk, Koper or Trieste when the live service and complete landed route justify them. |
| Czech terminal choice | Prague, Česká Třebová, Ústí nad Labem, Plzeň, Zlín or Ostrava can be evaluated according to the current operator network and final warehouse. |
| Final delivery | The inland terminal-to-warehouse road leg, unloading equipment and pallet limits must be included in the landed calculation. |
| Production and transit | Production, ocean transit, rail movement and final delivery are separate time periods. |
| Customs and tariff | The importer and customs broker confirm commodity classification, duty, VAT and clearance charges before the landed quotation is issued. |
| Minimum order | 70 m² |
| Samples and quotation | Samples free; courier credited against the first order. Per-unit quote within 24 hours after the specification is complete. |
Freeze–Thaw, Summer Heat and Roof Drainage
Czech weather is not extreme in one direction; repeated seasonal change is the detailing problem.
Freeze–thaw is mainly a trapped-water problem
Cold air alone is not the critical detail. Water held in a closed cavity or around blocked gaps expands and moves through repeated freeze–thaw cycles. Maintain fall, outlets, ventilation and clear perimeter gaps.
Snow load belongs to the supporting structure
The decking board is a wearing surface. Snow, people, furniture and board self-weight transfer into joists and supports. We provide profile data and metre weight; the project engineer checks the whole structure for the site.
South-facing terraces still get hot
Prague, Brno and other inland locations can have strong summer solar gain. Compare light and dark samples outside, especially for barefoot family terraces and pool areas. Colour choice does not replace a heat or comfort assessment.
Roof terraces need a water path below the boards
Board gaps only clear the top surface. The waterproofing, outlets and pedestal or joist build-up below must also drain. Do not hide a flat or blocked substrate under a visually level deck.
Pools, Spas and Public Terraces: Read the Slip Result Correctly
Czech commercial buyers often ask for a rating before naming the actual test method.
What our published result covers
R10 under AS 4586-2013 Appendix D, ramp method at 15 degrees, Intertek report 230625005SHF-001, measured on profile ZSGJ138H23A. It is a shod wet result and belongs to that named profile.
A barefoot pool area is a different classification
Do not convert R10 into a barefoot class or use it as a catalogue-wide statement. Send the specification or tender method; we will state whether the existing evidence matches and expose the gap when it does not.
Three Mistakes Czech WPC Importers Can Avoid
The competition is already local, so imported stock has to be planned more carefully.
Comparing factory price with Czech warehouse price
The valid comparison includes ocean freight, terminal handling, inland rail or road, customs work, storage, samples, local sales support and working capital. Factory price is only one line.
Buying too many profile-colour combinations
A wide catalogue can become dead stock. Start with a disciplined matrix, retain batch spares and expand only after installers and dealers show what moves.
Leaving Czech-language material until arrival
Labels, installation guidance, product naming and the claims process should be ready before the container reaches the warehouse. Translation made after sales begin creates inconsistent advice.
Why Import When Czech WPC Is Already Available?
The Czech Republic has credible domestic manufacturers and strong local dealer networks. Importing only makes sense when the factory adds a defined commercial advantage.
Fill a range gap, not a warehouse
Use factory-direct supply for a profile, cap construction, colour programme or project quantity that is not already solved by local stock. If the local product already fits, importing a near-copy creates no durable advantage.
Own the specification and private label
A distributor can control profile naming, colour mix, packaging and the documentation pack. That is more valuable than a generic unbranded board that competes only on price.
Test with 70 m² before widening the range
A smaller first order can validate the installation, market response, route and claims workflow. Scale the combinations that sell rather than ordering a complete catalogue on assumption.
Be honest about lead time
Local Czech stock wins urgent projects. Factory-direct supply wins planned stock, repeat programmes and specifications where the factory relationship matters. The page should never imply that sea freight behaves like local pickup.
Warranty, and How a Claim Works
Stepped, not flat
Capped co-extrusion carries a 15-year limited schedule and classic uncapped 10 years. The covered value reduces in bands over time; ask for the schedule rather than reading only the headline number.
It starts at the destination port
Cover runs from the date the goods arrive and are signed for at the destination port. Keep the arrival record, invoice and batch documentation together.
The batch documents matter
A claim is assessed against the product and schedule supplied with that batch. Photographs, installation layout, maintenance history and retained sample boards make the investigation faster.
Talk to Us About the Czech Republic
Send the whole brief at once: profile, colour, quantity, project or stock model, preferred Czech terminal or warehouse, unloading limits and required date.
Distributor and project enquiry
Czech Republic: Common Questions
Ports, terminals and distributor ordering
What is the minimum order for the Czech Republic?
70 m². A distributor can test one profile-colour combination or a real project before committing to broad warehouse stock. Freight per square metre improves with volume.
Which port is normally used for Czech imports?
Hamburg is an established reference because of the rail connection to Prague, but the best route depends on the live carrier schedule, inland terminal and final warehouse. Other North Sea, Baltic or Adriatic ports can be compared.
Can you quote delivery to a Czech inland terminal?
We can structure the quotation around the requested shipping term and terminal. Your forwarder should confirm current rail, handling, storage, customs and final-road charges before the landed figure is approved.
Can one order mix profiles or colours?
A mixed programme can be discussed, but each additional combination divides stock and production planning. Start with the combinations most likely to sell and confirm packaging before the order.
Are private-label packs available?
Yes, OEM packaging and market-specific presentation can be discussed. Czech-language labels, installation guidance and claims wording should be agreed before production.
Are samples available?
Yes. Samples are free; you pay the courier and we credit it against the first order. Ask for a sawn sample so the cap, core and chamber geometry can be compared with local products.
Climate, installation and evidence
Is WPC decking suitable for Czech winters?
Yes, when drainage, gaps and the support structure are designed correctly. Freeze–thaw problems usually begin with trapped water, while snow load belongs to the whole structure rather than the board alone.
Which decking is best for Czech distributors?
There is no universal answer. Capped co-extrusion is the usual starting point for low-maintenance retail and hospitality ranges, but profile, price, local competition and stock turnover determine the final matrix.
What slip result is available?
Our published result is R10 under AS 4586-2013 Appendix D on profile ZSGJ138H23A. It is a shod wet ramp result, not a barefoot pool classification, and does not cover every profile.
What CE / CPR documents are available?
We hold scoped CE / CPR documentation against EN 15534-1 and EN 14041 for named profiles. Ask for the certificate and Declaration of Performance for the exact section.
What installation gaps are required?
Catalogue starting points are 5–7 mm between board sides, about 5 mm at a wall and 3–5 mm at butt joints. Butt joints sit on double joists. Final details depend on profile, length and site.
Can you prepare documentation for a Czech tender?
Yes. Declare the tender and required methods at the first enquiry. We provide applicable certificates, declarations, reports within scope, ISO certificates and batch documentation, while stating any evidence gap clearly.
Factory direct from Guangdong · Seaport plus Czech terminal planning · Private label · CE / CPR by profile · MOQ 70 m² · Samples available · Trade buyers only