Grey composite stair treads on a steel stringer with metal balustrade, rising between buildings

Best China WPC Decking Supplier in Austria — Direct From Our Own Extrusion Line

We are the plant, not a trading house. WPC decking is extruded on our own lines in Sihui, Zhaoqing, Guangdong, on dies we own and cut ourselves, at roughly 2,000 tonnes a month — about 100 containers. Every shipment leaves with a test report.

Written for the Austrian market, where two things work differently from every other page on this site. First, Austria has no seaport, so the container discharges in somebody else's country and the port you pick changes both the transit and the inland cost — and the right answer is different for Vorarlberg than it is for Kärnten. Second, altitude decides the specification more than latitude does: a balcony in Vienna and a Hütte terrace at 1,800 m are two different jobs with the same board. Minimum order is 70 m² — a first order does not have to be a container.

WPC Terrassendielen, direkt ab Werk. Tell us the delivery postcode before anything else — on this page that is not a formality, it is the first specification question.

Specification guides: Profiles, sections and metre weights · Roof terraces on adjustable pedestals

We also write for: Germany · the Netherlands · Belgium · Ireland · Poland · France · Spain · Italy · Greece · Sweden

🏭
The plant itself Sihui, Zhaoqing, Guangdong
🚂
Four port options Route depends on your Bundesland
⛰️
Altitude sets the spec Vienna ≠ 1,800 m
CE / CPR EN 15534-1 + EN 14041
📦
MOQ 70 m² Well under a container
🏗️
2,000 t / month Approx. 100 containers

No Seaport: The Port Choice Is Yours, and It Is Not a Detail

Every other market page on this site starts with the product. This one starts with logistics, because in Austria the container lands in another country and how it gets to you changes both the timing and the landed cost. Get this right at the quotation stage and the rest is ordinary.

Four realistic routes, and they suit different halves of the country

The container can discharge at a North Sea port — Hamburg or Bremerhaven — and come south by rail. It can discharge at Rotterdam or Antwerp and come up the Rhine corridor, which tends to suit the west. Or it can discharge on the Adriatic at Trieste or Koper, where rail runs inland from the quay towards Villach and Graz.

Which is shorter depends on where in Austria the goods are going, not on which port sounds closer to China. A delivery to Bregenz and a delivery to Klagenfurt have genuinely different best answers. That is why the first thing we ask for is the delivery postcode.

What we can and cannot decide for you

Your forwarder books the service and owns the inland leg — we quote against whichever routing you choose rather than telling you which is cheapest, because the inland rate depends on their contracts, not on ours. What we do is make sure the documentation matches the route from the start, so nothing gets reissued at a border. Give us the postcode and the two or three ports you are considering and we will put the quotation together on that basis.

One practical consequence for a distributor

If you hold stock for both ends of the country, it can be worth splitting a programme across two discharge ports rather than trucking everything from one. That only works if it is planned at the order stage. Tell us the split when you enquire and we quote it as one programme with two deliveries.

Austria: Route, Transit and Terms

Loading is Nansha or Yantian, both in Guangdong, both within trucking distance of the plant. The discharge port is the open variable.

ItemDetail
Port of loadingNansha or Yantian, Guangdong
North Sea routingHamburg or Bremerhaven, then rail south. About 50 days port to port on the sea leg; the inland leg is your forwarder's
Low Countries routingRotterdam or Antwerp, then the Rhine corridor by barge and rail. Often the sensible answer for Vorarlberg and Tirol
Adriatic routingTrieste or Koper, with rail running inland from the quay toward Villach and Graz. Often the sensible answer for Kärnten, Steiermark and the east
Which to useDepends on the delivery postcode rather than on the sea leg alone. Your forwarder decides and we quote against whichever you choose
Import dutyNo EU anti-dumping duty applies to our WPC products. Confirm the current tariff line with your own broker before quoting a landed price
Quantity per containerQuoted per order with the profile mix, because metre weight varies by section
Minimum order70 m²
SamplesFree; you cover the courier, credited against the first order
Quotation turnaroundWithin 24 hours, per unit

Altitude Decides the Specification, Not Latitude

Austria is a small country with a very large vertical range. The useful way to think about a job here is not north-versus-south but low-versus-high — and the two ends want different answers from the same board.

Higher up, the sun is harder on the surface

UV exposure increases with altitude, and a terrace at 1,500 or 1,800 m takes noticeably more of it than one in the Danube valley. On the capped range the co-extruded shield is the layer that carries the fade resistance, which is why we would put the capped grade on a mountain terrace and are happy to discuss the classic range for a sheltered courtyard in the city. Snow cover adds to it — a snowfield reflects light back up onto the underside of everything around it, so a mountain deck gets worked from both directions in spring.

The daily swing is wider than the annual average suggests

At altitude a clear day can run from below freezing at dawn to warm in the afternoon sun, repeatedly, through the shoulder seasons. Composite moves more along its length than timber does, and it is the cycling rather than the extremes that finds an under-gapped deck. Work to the upper end of the installation ranges: about 5 mm to a wall, 3–5 mm at butt joints, 5–7 mm between board sides. Boards laid on a cold morning are at their shortest — that is the trap.

Snow load is a structural question, and it belongs to your engineer

Alpine snow loads are set by your own national code against the altitude and the location, and whoever designs the substructure will already be working to them. What we give you is the input: the metre weight for the profile you are buying, in writing with the quotation — it runs from 2.00 to 7.27 kg/m across our deck schedule, so it is not a figure to assume. The deck's own dead load and the imposed snow load are then their arithmetic, not ours.

And in Vienna, none of the above is the problem

A city balcony or an inner-courtyard terrace is a different job: the constraints are the threshold height, getting material up through a stairwell, and the neighbours. That is usually a tile or low pedestal build-up rather than a framed deck — the pedestal system page covers heights, falls and drainage access in detail.

The Decking Range

Capped co-extrusion and classic uncapped, hollow and solid. Six of the sections ordered most often — the full schedule runs to well over a hundred.

Sloping Sites, Steps and Getting Material to the Job

Two things come up on Austrian enquiries that barely appear on our flatter markets: there are a lot of steps, and the last hundred metres of delivery can be the hard part.

Stair treads are a separate section with a tighter support spacing

Composite stair board specification: model ZSGJ138S22.5, 138 by 22.5 mm, 30 percent HDPE, 60 percent wood powder, 10 percent additive

Our stair board is ZSGJ138S22.5 at 138 × 22.5 mm, woodgrain, same 60/30/10 material as the deck boards. It is not a deck board cut to length — it is its own profile, it carries a tighter support spacing than a deck board, and it fixes with its own start clips onto a steel joist rather than the aluminium one used under decking. On a sloping site with three flights of steps that difference multiplies, so get it into the take-off early rather than discovering it on site.

The six-step fixing sequence

Six-step guide to installing composite stair boards with start clips and plastic clips on a steel joist

Start clip, tread groove onto the clip, push out to lock, plastic clip in, screw down, cut and fix the last one. Straightforward — but note the steel joist in the accessory list, because it is the part most often left off an order that was quoted from the decking schedule.

The last hundred metres

On a Hütte, an alpine hotel or anything above the road, the delivery does not end at the truck — material goes the rest of the way by service road, by lift, or by hand. That makes the board length and the metre weight planning inputs rather than footnotes: our boards run 2.9 / 3.6 / 4.0 / 5.8 m, and metre weight across the schedule runs 2.00 to 7.27 kg/m. Tell us the access constraint and we will quote the length that actually fits it, rather than the length that packs best in a container.

What the Board Is Made Of

Straight from our own catalogue, with nothing rounded up.

60% wood powder, 30% HDPE, 10% additives

WPC board composition: 60 percent wood powder and 30 percent HDPE, with a cutaway showing the co-extruded shield wrapped around the core

That is the whole recipe, and we would rather publish the additive share than print two numbers that do not add up to a hundred. On the capped range a co-extruded shield wraps a WPC core, and the shield is the wearing layer — it carries the fade and scratch resistance, and at altitude that is the sentence that matters. The material can be recycled and reused at end of life.

Sections and textures

Six capped WPC decking profiles with dimensioned cross sections

ZSGJ138H23A and ZSGJ138H23C at 138 × 23 mm, ZSGJ138H25 at 138 × 25, ZSGJ140S23 at 140 × 23, ZSGJ140S25 at 140 × 25, ZSGJ145S30 at 145 × 30. Capped surfaces run H1 straight grain and H2, H3 and H5 wood grain; the classic range uses its own codes, so quote the texture with the range. Full schedule with metre weights on the model page.

Colours — three ranges

BOHAI WPC decking colour card: co-extrusion, classic and 3D embossing ranges

Capped co-extrusion: Teak, Antique, Redwood, IPE, Light-grey, Walnut.
Classic uncapped: Teak, Redwood, Walnut, Coffee, Chocolate, Ebony.
3D embossing: Teak, Red Wood, Walnut, Chocolate, Light Grey, Dark Grey.

Grey lives in the capped range (Antique, Light-grey) and the 3D embossing range (Light Grey, Dark Grey). Order the whole job in one batch — pigment goes into the extrusion, so two runs of the same colour will not be identical, and on a hotel terrace extended in a second season that is the usual source of an argument.

Installation and Accessories

From our own installation guide. Put these figures on the drawing before the frame goes down.

The gaps, and the double joist

WPC decking installation guide showing board gaps, wall gap, butt joints, double joists and clip fixing

5–7 mm between the sides of adjacent boards. About 5 mm between a capped board and a wall. 3–5 mm at butt joints where two board ends meet. Butt joints sit on double joists — each board end gets its own joist, never a shared one. At altitude, where boards are almost always laid cold, work to the upper end of every range.

Accessories, with sizes

WPC decking accessories: start clip, plastic clip, expansion screw, L-shaped corner trim, WPC joist and aluminium joist

Stainless steel start clip, plastic clip, expansion screw, L-shaped corner trim 50 × 50 × 3000 mm, WPC joist 40 × 30 × 3000 mm, aluminium joist 40 × 25 × 2900 mm. Note the aluminium joist is 2900 mm, not 3000 — an easy hundred millimetres to lose when you take off quantities. Stair treads use a steel joist instead; see the stairs section above.

Clearing snow

This comes back to you as a complaint rather than to us, so it is worth saying at the point of sale. A steel-edged shovel dragged across a composite deck scratches the shield, and on a capped board the shield is the wearing layer. Plastic blade, push rather than chop, and leave the last few millimetres to melt. Grit and de-icing salt are hard on screws, clips and post bases long before they affect the board — specify the fixing grade at quotation rather than leaving it to site.

Ask About a Specific Profile

Send the postcode first

Per-unit price within 24 hours — not a range. The postcode and the altitude change both the routing and the recommendation, so put them in first.

Samples free; you cover the courier, credited to your first order.

What Owning the Line Gives You

Capacity you can book against

Roughly 2,000 tonnes a month, about 100 containers. What matters to a distributor is not the headline but that a repeat order does not queue behind somebody else's. Send the volume and the date; we answer with a slot, not a hope.

Dies are ours, so sections are ours

We own the moulds and cut them in-house. That is why the schedule runs past a hundred sections rather than a catalogue page — and why we can talk seriously about a market-specific profile.

A test report with every shipment

Goods are checked before despatch and the report travels with them. Routine, not negotiated — and on a route that crosses two or three borders, paperwork that matches the goods is worth more than usual.

Certification: What We Hold, and the Exact Scope

Austrian specifiers verify, so here is the whole picture including the exact scope — a certificate covering three profiles covers those three profiles. Ask and we send the document itself.

ItemStatusDetail and scope
CE marking / CPRHeld, scopedCertificate M.2024.206.C97619, UDEM International Certification (notified body), EU Regulation 305/2011 Annex V Clause 1.5, valid to 11 March 2029. Issued against EN 15534-1:2014+A1:2017 and EN 14041:2018 for WPC decking, brand Bongywood, profiles 138H23A, 140H25B and 138H23C. Ask before assuming it covers a profile outside that list
Reaction to fire, EN 13501-1Declared through EN 14041EN 14041:2018 requires a reaction-to-fire classification to EN 13501-1, and that class sits on the Declaration of Performance rather than on the certificate. Ask for the DoP for the profile you are quoting and you have the class in writing. The declaration covers the decking profile named on it
Surface burning, ASTM E84Held, scopedClass A. SGS report GZIN2404000442CM01-1_EN, 25 April 2024, to ASTM E84-23c: flame spread index 10, smoke-developed index 30. Run on a 138 x 23 mm board, white surface exposed, interior wall and ceiling finish category. This is the US method on the US scale; for an Austrian project the Euroclass on the DoP is the reference
ISO 9001HeldIAS25924Q1473R0M, valid to 29 April 2027
ISO 14001HeldIAS25924E0394R0M, valid to 29 April 2027
Slip resistanceHeld, scopedR10 under AS 4586-2013 Appendix D, Intertek report 230625005SHF-001, ramp method at 15 degrees, on profile ZSGJ138H23A. That is the SHOD wet method — the number that applies to a surface walked in shoes. Barefoot wet areas are assessed by a separate method with its own scale, so tell us which one your project has to satisfy
REACHDeclaration onlyManufacturer declaration of conformity, issued by us

Get the Documents Themselves

Nothing above is a claim you have to take on trust. Tell us which documents your project needs and we will send the PDFs — certificate, Declaration of Performance with the reaction-to-fire class, the laboratory reports, the ISO certificates and the warranty schedule.

Request the certificates and test reports

You get the document itself.

What We Do for a Distributor

A first order can be well under a container

Minimum order is 70 m². Roughly one hotel terrace or a handful of balconies — enough to test a colour, a profile and our paperwork before committing to a 40HQ. Most suppliers at this end of the market quote 1 × FCL and lose the first conversation.

Samples are free

You pay the courier and we credit it in full against your first order. Ask for a sawn sample: the cut end shows whether the cap runs all the way round the section or stops at the sides. If the job is at altitude, ask for a light colour and a dark one and compare them in direct sun.

A real number within 24 hours

Send the specification and the volume, get a per-unit price rather than a range. We need: profile, colour, quantity in m², delivery postcode, the altitude if it is a mountain job, and the date it has to be on the ground.

Private label, market-specific sections, testing on your profile

All three are conversations. We own the tooling, we already run sections cut for particular export markets, and where a project needs a test our documents do not cover we will put your profile through the laboratory — fee up front, credited against the order. Every result we send you names the profile it was measured on.

Near Water, Read the Slip Number Properly

Lakeside terraces around the Salzkammergut, hotel spa areas and pool surrounds all raise the same question, and the useful answer is about method rather than adjectives.

What our result is

R10 under AS 4586-2013 Appendix D, ramp method at 15 degrees, Intertek report 230625005SHF-001, measured on profile ZSGJ138H23A. That is the shod wet method — the number that describes a surface walked in shoes. It belongs to that profile and that method, and we will send the report so your own technician reads the scope on its face.

Barefoot wet areas use a different method and a different scale

A spa terrace or a lakeside jetty in August is a barefoot surface, and barefoot wet areas are assessed by a separate method against its own classification — a figure from one does not convert into the other. Establish which one your project, your client's insurer or the Ziviltechniker is asking for, then ask us for the report that matches. And on any project involving treated water, ask for the warranty schedule before you quote rather than after.

Three Things That Go Wrong When Europeans Import WPC

Not sales copy — these are the three that cost distributors money.

The frame is set out for timber

A joiner spaces joists at whatever timber decking takes, because that is the habit. Composite has a maximum support spacing and it is tighter than timber, and stair treads are tighter again. Get the figure for your profile in writing and put it on the drawing before the frame goes down. Wrong, and the deck does not collapse — it flexes underfoot permanently, and the fix is lifting the boards.

The end gap gets left out

The most expensive of the three, and the most likely at altitude, because boards laid on a cold morning are at their shortest and a gap that looks generous in May is the minimum by August. The figures are in the installation section above — and the double joist under a butt joint is the half of it people forget.

Batch colour is not matched later

Two composite decking boards in different grey tones side by side, showing batch colour variationPigment goes into the extrusion, so two runs of the same colour will not be identical. Order the whole job in one batch and keep spares from it. A board replaced in year four will not match — ours or anybody else's. On a hotel extended across two closed seasons, say so at quotation stage so the phases are run as one job.

Warranty, and How a Claim Works

Stepped, not flat

Capped co-extrusion carries 15 years, classic uncapped 10. Both step down by year rather than paying full value throughout: 100% of the value of the affected goods in years 1–3, then 80, 70, 50 and 40% through years 4 to 7, then reducing in bands to 10% in the final years. It covers peeling, cracking and overall uneven fading.

It starts at the destination port

Cover runs from the date the goods arrive and are signed for at the port — not our factory gate, and not the day your customer installs them. On a landlocked route where the goods then travel inland for days, that distinction is worth reading twice, and it works in the distributor's favour.

Certificates are per batch

The schedule that applies is the one on that batch's certificate, which is why the test report shipping with the goods matters. Keep it with the commercial paperwork. If a supplier quotes you a flat 25 years, ask for the schedule — the answer tells you more than the number.

Talk to Us About Austria

The full enquiry, if you would rather send everything at once. Lead with the postcode. You will hear back within 24 hours with a real per-unit price.

Distributor and project enquiry

Samples free — you cover the courier, credited in full against your first order. Business-to-business only.

Austria: Common Questions

Getting the goods here

Austria has no port — how does the container reach us?

Through somebody else's port, and which one is a real decision rather than a formality. North Sea routing through Hamburg or Bremerhaven then rail south; Rotterdam or Antwerp then the Rhine corridor, which often suits Vorarlberg and Tirol; or the Adriatic at Trieste or Koper with rail inland from the quay, which often suits Kärnten, Steiermark and the east. Tell us the delivery postcode and the ports you are considering and we quote against whichever routing your forwarder books.

Which port is cheapest?

It depends on the inland leg, and that is priced by your forwarder rather than by us, so we will not pretend to answer it for you. What we can say is that the sea leg to a North Sea port runs about 50 days and that the right answer genuinely differs between the west and the south-east of the country. Give us two or three options and we will quote each so you can compare like with like.

Can we split a programme across two ports?

Yes, and if you hold stock for both ends of the country it is often worth it rather than trucking everything from one discharge point. It has to be planned at the order stage — tell us the split when you enquire and we quote it as one programme with two deliveries.

What is the minimum order for Austria?

70 m². Roughly one hotel terrace or a handful of balconies. Freight per unit improves as you approach a full 40HQ, but a first order does not have to be one.

Altitude, snow and specification

Does a mountain project need a different board from a city one?

Usually a different grade rather than a different board. UV exposure increases with altitude and snow cover reflects more of it back up, so on an exposed terrace at 1,500 m or above we would specify the capped range, where the co-extruded shield is the layer carrying the fade resistance. For a sheltered inner courtyard in Vienna the classic range is a reasonable conversation. Tell us the altitude and the exposure and we will say which we would put on it.

How do we handle snow load?

It is a structural question and it belongs to whoever designs the substructure, working to your own national code for that altitude and location. What we give you is the input: the metre weight for the profile you are buying, in writing with the quotation. Across our deck schedule that runs from 2.00 to 7.27 kg/m, so it is not a figure to assume from another supplier's page.

Can the deck be cleared of snow?

Yes, with a plastic-bladed shovel, pushing rather than chopping, and leaving the last few millimetres to melt. A steel edge dragged across the surface scratches the shield, and on a capped board the shield is the wearing layer. Worth saying at the point of sale rather than in spring.

What are the installation gaps at altitude?

The same figures, worked to the upper end: 5–7 mm between board sides, about 5 mm to a wall, 3–5 mm at butt joints, butt joints on double joists. The reason is that boards are almost always laid cold here, which means they are at their shortest on the day they go down, and the daily swing through the shoulder seasons is wide.

Are stair treads the same as deck boards?

No. Our stair board is ZSGJ138S22.5 at 138 × 22.5 mm — its own profile, with a tighter support spacing than a deck board, its own start clips, and a steel joist rather than the aluminium one used under decking. On a sloping site with several flights that difference adds up, so get it into the take-off early.

Our site is above the road. Does that change anything?

It changes the board length. Our boards run 2.9 / 3.6 / 4.0 / 5.8 m and metre weight runs 2.00 to 7.27 kg/m across the schedule, so if the last stretch is by service road, lift or by hand, tell us the access constraint and we will quote the length that fits it rather than the length that packs best in a container.

What slip rating do the boards have?

R10 under AS 4586-2013 Appendix D, ramp method at 15 degrees, Intertek report 230625005SHF-001, measured on profile ZSGJ138H23A. That result belongs to that profile and that method — shod and wet, on the ramp. A spa terrace or a lakeside jetty is a barefoot surface, and barefoot wet areas are assessed by a separate method against its own scale, so tell us which one your project has to satisfy and we will send the report that matches.

Is there an anti-dumping duty on Chinese WPC into the EU?

No EU anti-dumping duty applies to our WPC products. The standard tariff line still applies, so confirm the current rate with your own customs broker before quoting a landed price — rates and classifications change and yours is the one that governs.

Send the postcode, the altitude and the quantity

Four routing options — Hamburg, Rotterdam, Trieste, Koper · Factory direct from Guangdong · CE / CPR M.2024.206.C97619 under EN 15534-1 and EN 14041 · ISO 9001 & 14001 · MOQ 70 m² · Test report with every shipment · Trade buyers only