
WPC Factory in China: How to Tell a Real Manufacturer From a Trading Company
Most supplier pages ask you to believe them. This one is a method instead. Below are six checks you can run on any Chinese WPC supplier before you pay anything, what a real factory's answer to each one looks like, and then our own answers — with the document numbers, so you can verify rather than trust.
The distinction is not a moral one. Plenty of trading companies are competent and honest. But a trader cannot change a profile, cannot give you a production slot, and cannot show you where a batch came from — because none of those things are theirs to give. If your business needs any of them, you need to know which you are talking to before the first order, not after.
We are the factory: 65 extrusion lines in Sihui, Zhaoqing, Guangdong, running on dies we cut ourselves. Every check on this page is one we are inviting you to run on us.
Specification guides: Profiles, sections and metre weights · Roof terraces on adjustable pedestals
We also write for: Germany · the Netherlands · Belgium · Ireland · Poland · France · Spain · Italy · Greece · Austria · Switzerland · Sweden
Why the Question Is Worth Asking Properly
Not because one is honest and the other is not. Because they can promise different things, and four of those things decide whether your project works.
Whether the section can be changed at all
A profile is made by a steel die. Whoever owns the die decides whether the section can change. If your market needs a different width, a different thickness, a deeper groove or a clip channel that matches a system you already stock, that is a tooling question — and a trading company cannot answer it, because the tooling belongs to whichever plant they bought from that month.
This is the single most expensive thing to discover late. You can get a long way into a project on the assumption that a section can be adjusted, and find out at the end that it cannot.
Whether a delivery date is a commitment or a hope
A factory knows what is on its lines next week. A trader knows what it was told. Both can give you a date; only one of them is the person who would have to move something else to keep it.
The practical difference shows up on the second order rather than the first. A repeat order that has to queue behind somebody else's is a repeat order you cannot plan around.
Whether a batch can be traced when something goes wrong
Composite complaints are almost always colour or surface, and almost always show up months later. Answering them means knowing which production run those boards came from. A plant has that record. An intermediary has an invoice.
This matters even when nothing goes wrong, because it is what makes a warranty claim a paperwork exercise instead of an argument about who is responsible.
Whether test evidence belongs to the goods you are buying
This is the one that catches people. A certificate covers named profiles, not a catalogue, and a test report covers the specific profile it was run on. When the supplier is an intermediary, the documents they forward may genuinely exist and still not cover the boards in your container.
So the question is never whether they have a certificate. It is whether the certificate names the profile on your order.
Six Checks You Can Run Before You Pay Anything
In the order we would run them. None of them requires a visit, a fee or a lawyer, and the first four can be done over email in an afternoon.
1. Ask who owns the dies — and ask to see a section drawing
Not do you have your own moulds, which gets a yes from everybody. Ask: who cut the die for this profile, and can you send the dimensioned cross-section?

A plant that owns its tooling produces something like the above without thinking about it, because the drawing is a working document they use every day. What you are testing is not the drawing, it is how long it takes to arrive. A supplier who has to ask someone else for it will take days and will send a catalogue photograph instead.
Then ask the follow-up that actually settles it: what would it take to change this dimension by 5 mm? A factory answers with a cost and a lead time for new tooling. An intermediary changes the subject.
2. Ask about capacity the right way round
Never ask how much capacity they have. Every supplier on earth answers that question with a large number, and the number is unverifiable and therefore worthless.
Ask instead: which weeks in the next two months do you have open, and what is on the lines now? That question has a different shape. It can only be answered by someone looking at a schedule, and the answer is specific enough to be checked later against what actually happens.
A useful third version for a programme rather than a single order: if I place this quantity monthly, which part of your line does it sit on, and what else runs on it?
3. Verify the report numbers with the laboratories, not with the supplier
Ask for the certificate and test reports as PDFs with the report numbers visible, then take those numbers to the issuing body. Notified bodies and the major laboratories will confirm whether a number is theirs and what it covers. This takes one email each.
Three things to check on the document rather than in the covering message:
- Which profiles are named. A CE certificate lists them. If your profile is not on the list, the certificate does not cover your order, whatever else is true.
- Which method and which condition. A slip figure means nothing without the method and whether it was measured wet or dry, shod or barefoot — the numbers from different methods do not convert into one another.
- The date and the validity. Certificates expire.
If a supplier is reluctant to give you the numbers, you already have your answer, and it cost you nothing.
4. Ask for a video walk, and specify the route
A video call is the cheapest audit there is, and almost everybody wastes it by letting the supplier choose what to show. A finished-goods area and a stack of boards prove nothing — that is what a trading company can borrow.
Specify the route instead, and ask for it in one continuous take: raw material store, then compounding and pelletizing, then the extrusion line running, then the finished goods area, then a container being loaded. Ask them to walk it without cutting.
What you are looking for is the boring middle. Anybody can show you boards. The material store and the pelletizing stage are the parts an intermediary does not have, and they are also where the batch-to-batch consistency you care about is actually decided.
5. Ask for a sawn sample, not a sample
Free samples are universal and nearly useless, because a polished offcut tells you about the surface and nothing about the construction. Ask for a piece cut across the section.
The cut end answers in two seconds what a specification sheet takes a paragraph to dodge: whether the cap goes all the way round the profile or stops at the sides, whether the chambers are round or square, and how thick the walls actually are. It is also the only way to see whether the cap thickness is even.
Ask for more than one colour while you are at it, and ask whether they come from the same production run.
6. Read the shape of the quotation, not just the number
A factory quotes a unit price against a specification: this profile, this colour, this quantity, this port, this date. An intermediary quotes a range, because the range is the room they need.
Two other things worth reading in a quotation. Does it state what the metre weight is? Freight and container quantity depend on it, and a supplier who does not know the metre weight of their own profile is telling you something. And does the minimum order look like a factory's or a trader's? A plant can run a small first order because it is a short run on an existing line. A very high minimum is often somebody consolidating.
None of this means a range is dishonest. It means a range is not a price, and you cannot build a landed cost on it.
What Each Check Actually Tests
The same six, compressed. Print this next to the email you are about to send.
| What you ask | What a plant's answer looks like | What the check is really for |
|---|---|---|
| Who cut the die for this profile, and what would 5 mm cost? | A dimensioned drawing straight away, then a tooling cost and lead time | Whether the section can ever be changed for your market |
| Which weeks are open, and what is on the lines now? | A schedule answer, specific enough to check later | Whether a delivery date is a commitment or a relay |
| The certificate and reports as PDFs, numbers visible | Sent without negotiation, profiles named on the document | Whether the evidence covers the boards in your container |
| A video walk: material store to pelletizing to extrusion to loading, uncut | The boring middle of the plant, on one take | Whether they have the stages a trader cannot borrow |
| A sample sawn across the section | A cut end showing the cap, the chambers and the wall thickness | How the board is built, rather than how it looks |
| A unit price against a full specification | One number, plus the metre weight | Whether they know their own product well enough to price it |
Our Own Answers to All Six
Same order. With numbers, because a method is worth nothing if the person publishing it will not submit to it.
1. The dies are ours and we cut them here
We own our moulds and cut them in-house, which is why the schedule runs past a hundred sections rather than a catalogue page. The dimensioned sections are on this page already — ZSGJ138H23A and ZSGJ138H23C at 138 × 23 mm, ZSGJ138H25 at 138 × 25, ZSGJ140S23 at 140 × 23, ZSGJ140S25 at 140 × 25, ZSGJ145S30 at 145 × 30.
On changing a dimension: that is a real conversation with a real cost, and we would rather have it at the quotation stage. We already run sections cut for particular export markets, so it is not an unusual request.
2. Capacity, and the way we would rather you ask
Roughly 2,000 tonnes a month — about 100 containers. That is the headline number and by our own argument above you should not put much weight on it.
The useful version: send the volume and the date, and we answer with a slot. Standard catalogue sections run to a 20-day production period before shipping. If a repeat order is likely, say so at the first order and we will schedule the quantity together rather than treating it as two unrelated runs.
3. The document numbers, in full, for you to check
Take these to the issuing bodies rather than to us:
- CE / CPR: M.2024.206.C97619, UDEM International Certification (notified body), EU Regulation 305/2011 Annex V Clause 1.5, valid to 11 March 2029, against EN 15534-1:2014+A1:2017 and EN 14041:2018. It names profiles 138H23A, 140H25B and 138H23C — by our own rule above, ask us before assuming it covers anything else.
- Surface burning, ASTM E84: SGS report GZIN2404000442CM01-1_EN, 25 April 2024, to ASTM E84-23c, flame spread 10, smoke developed 30, Class A. Run on a 138 × 23 mm board, white surface exposed.
- Slip: Intertek report 230625005SHF-001, R10 under AS 4586-2013 Appendix D, ramp method at 15 degrees, on profile ZSGJ138H23A. That is the shod wet method — the figure that applies to a deck walked in shoes. Barefoot wet performance is measured by a separate method, so tell us which one your project has to satisfy and we will send the report that matches.
- ISO 9001: IAS25924Q1473R0M and ISO 14001: IAS25924E0394R0M, both valid to 29 April 2027.
Reaction to fire for a European project sits on the Declaration of Performance for the specific profile rather than on the certificate, because that is what EN 14041 requires. Ask for the DoP for the profile you are quoting and the class is in writing.
4. The address, and an open invitation
Sihui, Zhaoqing, Guangdong. Buyers and third-party inspectors are welcome on site, and we will walk the route in the order set out above rather than the order that flatters us.
If a visit is not practical, a video walk is — same route, one take. Goods are checked before despatch as a matter of routine and the test report travels with the shipment, so you can also simply ask to see the report from the last container that went to your market.
5. Samples, sawn, and what they cost
Free. You cover the courier and we credit it in full against your first order. Ask for the cut end, ask for two or three colours, and ask whether they are from one run — the answer to that last one is worth knowing about any supplier.
One thing we will tell you before you ask, because it is true of every composite including ours: pigment goes into the extrusion, so two production runs of the same colour will not be identical. Order a job in one batch and keep the spares from it.
6. How we quote
A unit price within 24 hours, not a range, against a specification: profile, colour, quantity in m², discharge port and the date it has to be on the ground. Metre weight varies by section and we state it, because container quantity and freight per square metre both depend on it.
And the minimum: 70 m². Well under a full container, and it exists precisely so a first order can be a test of everything on this page rather than a commitment.
What We Can Change, and What to Tell Us
Owning the tooling is only useful if you know what it lets you ask for.
Sections, colours, packaging and private label
All four are ordinary conversations. We own the dies, so a market-specific section is a costed question rather than a refusal. Colour runs across three ranges — capped co-extrusion, classic uncapped and 3D embossing — and the same colour name in two ranges is not the same colour, so specify the range as well as the name.
On packaging and private label: tell us the pack format, the labelling and the market it is going into, and we will tell you plainly what we can do and what would need setting up. That is a more useful answer than a yes.
Testing on your own profile
Where a project needs evidence our current documents do not cover, we will put your profile through the laboratory — fee up front, credited against the order. Every result we send names the profile it was measured on, which is the whole point of doing it that way.
What to put in the first email
Six things, and it saves a round trip: profile or model number, colour and range, quantity in m², discharge port, the country the deck is being built in, and the date it has to be on the ground. If you do not know the profile yet, send the application and the span and we will name one.
Send the Specification, or Send the Six Questions
Either is a fair first email
A unit price within 24 hours. Or ask us the six checks above and we will answer them in writing, with the document numbers.
Buying From the Plant Directly
| Item | Detail |
|---|---|
| Plant location | Sihui, Zhaoqing, Guangdong |
| Ports of loading | Nansha or Yantian, both within trucking distance |
| Output | Approx. 2,000 tonnes a month, about 100 containers |
| Tooling | Own moulds, cut in-house; schedule runs past a hundred sections |
| Production period | 20 days for standard catalogue sections, before shipping |
| Minimum order | 70 m² |
| Samples | Free, sawn on request; you cover the courier, credited to the first order |
| Quotation | Unit price within 24 hours against a full specification |
| With every shipment | Pre-despatch check and the test report travelling with the goods |
| Site visits | Buyers and third-party inspectors welcome |
Factory, Certification and First Orders
Verifying a supplier
How do I know you are a factory and not a trading company?
Run the six checks on this page rather than taking our word for it. The fastest three: ask for the dimensioned cross-section of a profile and see how long it takes to arrive; ask which weeks are open on the lines rather than how much capacity we have; and take the document numbers on this page to the issuing bodies — UDEM for the CE certificate M.2024.206.C97619, SGS for report GZIN2404000442CM01-1_EN, Intertek for 230625005SHF-001. If you want the fourth, ask for a video walk from the raw material store through pelletizing and extrusion to a container being loaded, in one take.
Why does it matter whether my supplier owns the dies?
Because the die decides whether the section can change. If your market needs a different width, thickness or clip channel, that is a tooling question, and it can only be answered by whoever owns the tooling. It also decides whether a repeat order is a short run on an existing line or a new negotiation with a third party.
What is the right way to ask about capacity?
Not how much they have — that answer is a large unverifiable number. Ask which weeks in the next two months are open and what is running on the lines now. Only someone looking at a schedule can answer that, and the answer is specific enough that you can check it later against what happened.
What should I ask to see in a video factory tour?
Specify the route and ask for one continuous take: raw material store, compounding and pelletizing, the extrusion line running, finished goods, then a container being loaded. The finished goods area proves the least, because it is the part an intermediary can borrow. The material store and the pelletizing stage are the parts they do not have, and they are also where batch-to-batch consistency is actually decided.
Why a sawn sample rather than a normal one?
A polished offcut tells you about the surface and nothing about the construction. The cut end shows whether the cap runs all the way round the profile or stops at the sides, whether the chambers are round or square, and how even the cap thickness is. Ask for two or three colours as well, and ask whether they came from the same production run.
Certification scope
Do you have CE marking, and what does it cover?
Certificate M.2024.206.C97619 from UDEM International Certification, a notified body, under EU Regulation 305/2011 Annex V Clause 1.5, valid to 11 March 2029, issued against EN 15534-1:2014+A1:2017 and EN 14041:2018. It names WPC decking profiles 138H23A, 140H25B and 138H23C. Quoting something outside that list? Ask us and we will tell you what the certificate actually covers — that is exactly the check this page is asking you to run.
Where is the fire classification?
For a European project it sits on the Declaration of Performance for the specific profile, not on the certificate, because that is what EN 14041:2018 requires. Ask for the DoP for the profile you are quoting and the EN 13501-1 class is in writing. Separately we hold ASTM E84 Class A — SGS report GZIN2404000442CM01-1_EN, flame spread 10, smoke developed 30, run on a 138 × 23 mm board — which is the US method on the US scale.
What slip figure do you hold, and on which profile?
R10 under AS 4586-2013 Appendix D, ramp method at 15 degrees, Intertek report 230625005SHF-001, measured on profile ZSGJ138H23A. That result belongs to that profile and that method: shod and wet, on the ramp. Barefoot wet performance is measured by a separate method, so tell us which one your project has to satisfy and we will send the report that matches.
Can you test our own profile?
Yes, where a project needs evidence our current documents do not cover. Fee up front, credited against the order. Every result we send names the profile it was measured on.
First orders
What is the minimum order?
70 m². Well under a full container, and it exists so that a first order can be a test of everything on this page — the paperwork, the colour, the section and how we behave — rather than a commitment to a 40HQ.
How long does production take?
20 days for standard catalogue sections, before shipping. Sea time is separate and depends on the route; we quote both against your date rather than giving you one number and letting you work it out.
Can you do private label or market-specific packaging?
Both are ordinary conversations. Tell us the pack format, the labelling and the market it is going into, and we will tell you plainly what we can do and what would need setting up. That is more useful to you than a yes.
What do you need in the first email?
Profile or model number, colour and range, quantity in m², discharge port, the country the deck is being built in, and the date it has to be on the ground. If you do not know the profile yet, send the application and the span and we will name one.
Factory in Sihui, Zhaoqing, Guangdong · Own dies, cut in-house · Approx. 2,000 t per month · CE / CPR M.2024.206.C97619 (UDEM) · ASTM E84 Class A, SGS GZIN2404000442CM01-1_EN · R10, Intertek 230625005SHF-001 · ISO 9001 & 14001 · MOQ 70 m² · 20-day production · Buyers and third-party inspectors welcome · Trade buyers only