
WPC Decking for Croatia — Factory Direct to the Adriatic
BOHAI is the manufacturer, not a trading house. We extrude WPC composite decking on our own lines in Sihui, Zhaoqing, Guangdong, using dies we own and maintain in-house. Standard production is approximately 2,000 tonnes a month, and a batch test report travels with every shipment. For buyers comparing composite deck companies serving Croatia, BOHAI is the manufacturer behind the boards rather than a reseller.
Croatia is not one exposure condition. A hotel terrace in Istria, an island villa in Dalmatia, a bora-exposed elevated deck near the Velebit Channel and a continental project in Zagreb do not need the same logistics or detailing. Minimum order is 70 m², so a distributor can test one profile and colour on a real project before holding broad stock.
For Croatian buyers, the route can be priced through Rijeka or compared with Koper when the final delivery point and carrier schedule justify it. The useful quotation is not the lowest ocean line: it is the combination of profile, accessories, production slot, discharge port, inland leg and the week the deck must be ready for guests.
Your WPC Decking Manufacturer and Supplier for Croatia

- ✓Factory direct — not a trading company
- ✓Rijeka and Koper route comparison
- ✓Adriatic project packing planned before loading
- ✓Documents tied to the named profile
- ✓MOQ 70 m² — one real project
- ✓Capped and classic decking ranges
- ✓Unit price within 24 hours
- ✓Batch report with every shipment
Specification guides: Profiles, sections and metre weights · Roof terraces on adjustable pedestals · How to tell a real WPC factory from a trader
We also write for: Germany · the Netherlands · Belgium · Ireland · Poland · France · Spain · Italy · Greece · Austria · Switzerland · Sweden · Slovenia · the Czech Republic · Slovakia
Rijeka or Koper: Price the Route to the Actual Site
Croatia has its own Adriatic gateway, but the best discharge plan still depends on the project location, sailing and final road or rail movement.
Rijeka is the domestic starting point
For Zagreb, Kvarner and much of the Croatian market, Rijeka is the natural port to price first. Ask for the current sailing, terminal and inland leg as one calculation. Production time, port-to-port transit and final delivery are separate dates, and all three must fit the installation programme.
Koper can be a valid comparison, not an automatic answer
For northern Croatia or a mixed Slovenia–Croatia distribution programme, Koper may be worth comparing when carrier frequency and haulage line up. We will price the requested shipping term; the buyer’s forwarder should compare the complete landed route rather than one attractive freight line.
Holiday openings create a backward planning date
A hotel, campsite or villa terrace cannot be specified by saying “before summer.” Start with the reopening or handover week, subtract inland delivery, port handling, sea transit and production, then leave contingency before the installer arrives. That date belongs in the first enquiry.
The Decking Range
Capped co-extrusion and classic uncapped, hollow and solid. Six sections that cover most distributor and project briefs.






Croatia Has Four Different Decking Conditions
The Adriatic Sea, the Dinaric mountains and the continental interior create different exposure and logistics problems inside one market.
Istria and the Dalmatian coast
Strong summer sun, salt air and hospitality cleaning make capped co-extrusion the usual starting point. The composite board does not corrode, but clips, screws, joist connectors and post bases can. Specify every metal component for the real coastal exposure.
Bora-exposed elevated terraces
Around Kvarner, Senj and the Velebit Channel, wind is not a board-selection slogan. Anchorage, pedestal restraint, perimeter details and balustrades belong to the project engineer. We provide profile data and metre weight; the responsible local professional designs the assembly for the site.
Islands and ferry-dependent projects
Hvar, Brač, Korčula and other island sites add one more handling stage. Board length, pallet weight, forklift access, ferry booking and dry storage at the destination should be confirmed before the container is loaded. A damaged pallet on the mainland is inconvenient; on an island it can stop the installation.
Zagreb and the continental interior
Inland Croatia has colder winters, freeze–thaw cycles and less coastal salt exposure. Drainage, ventilation and the support design remain decisive. Water trapped below the boards causes more winter trouble than low air temperature alone.
What the Board Is Made Of, and What the Surface Does
The specification starts with the construction, not the colour name.
60% wood powder, 30% HDPE, 10% additives

On the capped range a co-extruded polymer shield wraps the WPC core. The shield is the wearing layer and carries the fade, stain and scratch resistance. Classic boards are uncapped, which lowers cost but changes the cleaning and weathering expectations.
Sections and textures are separate decisions

A complete specification names the range, profile, surface texture and colour. The full profile schedule is on the models page. Do not carry a span or metre weight from one section to another simply because the face width looks similar.
The gaps are working parts of the deck
Side and end gaps allow thermal movement and carry water off the face. They are not cosmetic tolerances. On exposed coastal or cold inland projects, blocked gaps turn rain and trapped water into standing water; on a long summer terrace, missing end gaps can turn expansion into buckling.
Colours — Three Ranges
Colour and texture are selected independently from the profile.
The full colour card

Capped co-extrusion: Teak, Antique, Redwood, IPE, Light-grey, Walnut.
Classic uncapped: Teak, Redwood, Walnut, Coffee, Chocolate, Ebony.
3D embossing: Teak, Red Wood, Walnut, Chocolate, Light Grey, Dark Grey.
Judge the sample where the project will be built
White limestone, full Adriatic sun and shaded urban courtyards do not read the same colour the same way. Put the physical sample outdoors at the project, let it heat through a clear afternoon and compare it again in shade. For barefoot coastal and pool terraces, start with lighter tones because every dark exterior surface absorbs more heat.
Order the whole visible area in one batch
Pigment is mixed into the extrusion run, so separate batches of the same named colour are not identical. Order one visible area together and keep spare boards from that batch. This matters on hotels and spa projects installed in stages.
Where WPC Decking Goes in Croatia
The main project types have different commercial calendars and technical requirements.
Hotels, campsites and holiday villages
High seasonal footfall makes cleaning, spare-board planning and a documented surface choice important. Order the visible area and maintenance spares from one batch, then work backward from the opening date rather than the day the installer becomes available.
Coastal villas, pools and restaurant terraces
Use colour samples outdoors before approval: dark boards can feel hotter in direct Adriatic sun. Pool and restaurant projects also need the required slip test method stated before a profile is promised; a shod wet result is not a barefoot classification.
Island projects and waterfront access
Keep the decking specification separate from marine engineering. We supply boards, clips and profile data; the local designer must address wind, salt exposure, support corrosion and any structure over or beside water. Packaging should be planned for the final crane, forklift or manual handling step.
Urban balconies and roof terraces
Zagreb and coastal-city projects are often limited by threshold height, waterproofing and permissible point loads. Send the available build-up height and whether the membrane may be penetrated before choosing joists, pedestals or deck tiles.
Installation and Accessories
Put these details on the drawing before the frame is built.
Gaps and double joists

5–7 mm between adjacent board sides, about 5 mm at a wall, and 3–5 mm at butt joints are the catalogue starting points. Butt joints sit on double joists so each board end has its own support. Final spacing and support centres must match the exact profile and project conditions.
Accessories, with sizes

The system includes starter clips, plastic hidden clips, expansion screws, 50 × 50 × 3000 mm corner trim, 40 × 30 × 3000 mm WPC joist and 40 × 25 × 2900 mm aluminium joist. The metal grade still has to be specified for coastal or de-icing-salt exposure.
Ask About a Specific Profile
Send the profile, area, Croatian delivery point and the week the deck must be ready.
A real specification before a real price
Send the project city or island, profile, colour, area and handover week. We reply with a per-unit price, the applicable documents and the current Rijeka/Koper route comparison.
What Owning the Line Gives You
Capacity you can book against
Approximate production capacity is 2,000 tonnes a month. Send the volume and required arrival date; we answer with a production slot rather than treating lead time as a slogan.
Dies are ours
We own and cut the tooling used on our extrusion lines. That permits market-specific sections and gives us direct control over dimensional checks and repeat production.
A batch report travels with the goods
Routine checks are recorded before dispatch and the report travels with the shipment. Keep it with the commercial documents; it is often the first document requested on a public or hospitality project.
Certification: What We Hold, and the Exact Scope
Ask for the document itself and read the profile named on it.
| Item | Status | Scope |
|---|---|---|
| CE marking / CPR | Held, scoped | Certificate M.2024.206.C97619, UDEM, valid to 11 March 2029; issued against EN 15534-1:2014+A1:2017 and EN 14041:2018 for the named decking profiles. Ask before assuming it covers another profile. |
| Declaration of Performance | Available by profile | The reaction-to-fire declaration belongs on the DoP for the profile being quoted. It is not created by copying a class from another board. |
| Slip resistance | R10, scoped | Intertek report 230625005SHF-001 under AS 4586-2013 Appendix D, measured on profile ZSGJ138H23A. It is a shod wet ramp result, not a barefoot pool classification. |
| ASTM E84 | Held, scoped | Class A result on a named 138 × 23 mm board. This is a US test method and does not replace the European classification required for a Croatian project. |
| ISO 9001 / ISO 14001 | Held | Quality and environmental management certificates valid to April 2027. |
| Tests not held | State the gap | Where a tender asks for a method or profile outside the existing evidence, testing can be discussed before quotation. We do not relabel another method as an equivalent. |
What We Do for a Distributor
A first order can be smaller than a container
The minimum order is 70 m². That lets a Croatian distributor test one profile, colour, delivery route and documentation pack on a real project before committing to container stock.
Samples are free
You cover the courier and we credit it against the first order. Ask for a sawn sample so the cap construction and core are visible, and compare a light and a dark colour outdoors.
A per-unit quotation within 24 hours
Send profile, colour, quantity, destination, project postcode and required date. We return a unit price and identify which technical documents apply to that exact section.
Private label and regional stock planning
OEM packaging, mixed colour programmes and market-specific sections are available for discussion. If Koper will feed several countries, tell us the split before packing so the pallets and documents follow the distribution plan.
Croatia: Route, Transit and Terms
Services and freight prices change, so the current sailing and complete inland route are confirmed at quotation.
| Item | Detail |
|---|---|
| Port of loading | Nansha or Yantian, Guangdong |
| Primary Croatian comparison | Rijeka; the terminal and inland leg are confirmed against the current carrier and forwarder plan. |
| Alternative comparison | Koper may be compared for northern Croatia or a mixed regional distribution programme when the full landed route supports it. |
| Island delivery | Quote the mainland discharge separately from ferry, local handling and final-site access. Provide maximum pallet length and lifting limits before loading. |
| Production and sea transit | Quoted as separate time periods. Port-to-port transit is taken from the live carrier schedule. |
| Customs and tariff | The importer and customs broker confirm commodity classification, duty, VAT and clearance charges before the landed quotation is issued. |
| Minimum order | 70 m² |
| Samples | Free; courier paid by the buyer and credited against the first order |
| Quotation | Per-unit price within 24 hours after the specification is complete |
Adriatic Sun, Salt, Wind and Continental Winter
Croatian projects fail when four separate design questions are collapsed into the word “weatherproof.”
UV exposure changes the colour decision
A cap layer carries most of the surface weathering load, but no outdoor colour is frozen forever. Compare physical samples in the intended sun and specify realistic colour tolerance. Darker colours can also run hotter under full summer sun.
Salt exposure changes the metal schedule
WPC does not make the fasteners immune to corrosion. Write the clip, screw, connector, base plate and any exposed aluminium or steel into the coastal specification. The local designer or supplier of the metal system should confirm the grade for the site.
Bora exposure changes the assembly
Wind uplift and lateral loads are about the complete structure. A loose pedestal field, unrestrained edge or inadequately anchored frame cannot be corrected by choosing a heavier board. Elevated coastal decks need local engineering.
Inland freeze–thaw changes drainage priorities
Water trapped in a closed cavity is the winter risk. Maintain fall, keep board gaps open, allow the substructure to ventilate and provide a real outlet below the wearing surface.
Pool and Waterfront Decking: Read the Slip Result Correctly
Croatian hospitality projects often involve pools, spas or wet foot traffic, so the test method matters as much as the result.
What our published result covers
R10 under AS 4586-2013 Appendix D, ramp method at 15 degrees, Intertek report 230625005SHF-001, measured on profile ZSGJ138H23A. It is a shod wet result and belongs to that named profile.
Barefoot wet areas use a different question
A pool surround used barefoot may require another method and scale. Do not convert R10 into a barefoot class or extend it across the catalogue. Send the project requirement and we will state whether the existing evidence matches.
Three Croatia-Specific Procurement Mistakes
These mistakes appear after the board price has already been agreed.
The order is timed to installation, not opening
Hotels and campsites need contingency before guests arrive. Count backward from handover through inland delivery, port handling, sailing and production. A cheap late shipment is not a saving.
Island handling is left to the last carrier
Long pallets, limited forklifts and ferry schedules can change the final kilometre. Confirm pallet length, weight, lifting points and dry storage with the island contractor before we pack.
A coastal quotation lists boards but not metals
Clips, screws, joist connectors and edge details belong in the specification. If the board is suitable but the metal schedule is not, the system is not suitable.
Croatia Project Documentation: Scope Before Claims
We have prepared formal technical scope material for a Croatian customer in another WPC product family. That history proves a document workflow — it does not turn one product’s evidence into another product’s claim.
The tested system stays named
For decking, we provide certificates, declarations and laboratory reports only where the named profile and test scope match. We do not reuse a fencing result as decking evidence or present one report as catalogue-wide approval.
The commercial specification is fixed before production
The quotation should identify the profile, surface, colour, length, accessories, quantity, packaging and agreed Incoterm. That is the reference used for the production order and packing list.
The shipment pack is assembled to the order
Available documents can include the commercial invoice, packing list, applicable CE / CPR file, Declaration of Performance, laboratory reports within scope and the batch test report. Tender requests should be declared at the first enquiry.
Local acceptance remains a local decision
We supply the source documents and exact report numbers. The Croatian importer, specifier or authority decides whether that evidence satisfies a particular project. A responsible supplier should expose the scope boundary, not guess past it.
Warranty, and How a Claim Works
Stepped, not flat
Capped co-extrusion carries a 15-year limited schedule and classic uncapped 10 years. The covered value reduces in bands over time; ask for the schedule rather than reading only the headline number.
It starts at the destination port
Cover runs from the date the goods arrive and are signed for at the destination port. Keep the arrival record, invoice and batch documentation together.
The batch documents matter
A claim is assessed against the product and schedule supplied with that batch. Photographs, installation layout, maintenance history and retained sample boards make the investigation faster.
Talk to Us About Croatia
Send the whole brief at once: profile, colour, area, delivery point, coastal or inland exposure, island handling if applicable, and the week the deck must be ready.
Distributor and project enquiry
Croatia: Common Questions
Ordering, Rijeka and island delivery
What is the minimum order for Croatia?
70 m². A first order can cover one hotel terrace, villa project or distributor trial. Freight per square metre improves with volume, so we quote the exact profile, colour and route.
Can WPC decking ship through Rijeka?
Yes. Rijeka is the first Croatian port route to compare. We confirm the current sailing and shipping term at quotation; your forwarder or broker confirms local terminal, customs and final delivery charges.
When should Koper be compared with Rijeka?
Koper can be worth comparing for northern Croatia or a combined regional stock programme. The decision should use the complete landed cost and schedule, not ocean freight alone.
Can you pack for a Croatian island project?
Yes, but we need the final handling plan first: maximum pallet length and weight, forklift or crane access, ferry stage and dry storage. Packaging is part of the delivery design.
How early should a hospitality project order?
Start from the required opening or handover week and work backward through inland delivery, port handling, sailing and production, with contingency before installation. We confirm live timing after the specification is complete.
Are samples available?
Yes. Samples are free; you pay the courier and we credit it against the first order. Compare shortlisted colours outdoors at the project because Adriatic sun changes how they read.
Coastal exposure, specification and evidence
Is WPC decking suitable for the Croatian coast?
Yes, when the whole system is specified for the site. The board does not corrode, but fixings and the support structure must suit salt exposure; elevated decks also need local wind engineering.
Which profile is best for hotels and campsites?
Capped co-extrusion is normally the starting point because cleaning, stains and colour consistency matter under seasonal footfall. The final choice still depends on support spacing, slip requirement and budget.
What slip result is available for pool projects?
Our published result is R10 under AS 4586-2013 Appendix D on profile ZSGJ138H23A. It is a shod wet ramp result, not a barefoot pool classification, and should not be extended to other profiles.
What CE / CPR documents are available?
We hold scoped CE / CPR documentation against EN 15534-1 and EN 14041 for named profiles. Ask for the certificate and Declaration of Performance for the exact section rather than assuming one file covers the catalogue.
What gaps are required?
Catalogue starting points are 5–7 mm between board sides, about 5 mm at a wall and 3–5 mm at butt joints. Butt joints sit on double joists. Final details depend on profile, length and site conditions.
Can you provide documents for a Croatian tender?
Yes. Declare the tender at the first enquiry. We can provide applicable certificates, Declaration of Performance, reports within their scope, ISO certificates and batch documentation, and we will state where existing evidence does not match the requested method.
Factory direct from Guangdong · Rijeka or Koper route · Adriatic project planning · CE / CPR by profile · MOQ 70 m² · Samples available · Trade buyers only