
Komposittrall Direct From Our Own Extrusion Line — WPC Decking for Sweden
We are the plant, not a trading house. WPC decking is extruded on our own lines in Sihui, Zhaoqing, Guangdong, on dies we own and cut ourselves, at roughly 2,000 tonnes a month — about 100 containers. Every shipment leaves with a test report.
Written for the Swedish market, and built around the fact that governs everything here: the season is short, and it is the same short season for every one of your customers. Decks get specified, laid and sold inside a narrow window, so the lead-time question is not how fast we can ship — it is which season the goods are for. About 50 days at sea plus production means an order placed in autumn is stock for spring, and one placed in April is stock for the year after. Below: that timing worked through properly, what the thaw does to a deck (the freeze is the easy part), and an honest comparison against the timber you already have plenty of. Minimum order is 70 m².
Komposittrall, factory direct. Gothenburg also serves Norway, Denmark and Finland — if you distribute across the Nordics, say so when you enquire and we will quote the programme rather than the pallet.
Specification guides: Profiles, sections and metre weights · Roof terraces on adjustable pedestals
We also write for: Germany · the Netherlands · Belgium · Ireland · Poland · France · Spain · Italy · Greece · Austria
The Season Is the Whole Planning Problem
Every market has a decking season. Sweden has a short one, and because it is short it is also synchronised — your customers all want the same thing in the same eight weeks. That single fact should shape how you buy, and it is the first thing we would talk about.
Sea time plus production means you are buying a season ahead
Transit is about 50 days port to port, and production runs before that and is confirmed against your volume when we quote. Add the two together and the arithmetic is plain: an order placed in autumn is stock on the ground for spring. An order placed in April is stock for the following year.
This is not a warning, it is a planning tool. Distributors who order in September start the season with stock while their competitors are quoting lead times. Tell us the season you are buying for rather than the date you want the container, and we will work backwards to the production slot with you.
Which is why the minimum order is 70 m²
A short season makes a large speculative first order genuinely risky, and we would rather you tested a colour and our paperwork on 70 m² than committed to a 40HQ on faith. Freight per unit improves as you approach a full container, so most accounts grow into one — but the first order does not have to be one.
And why a repeat order has to be the same batch
If the season goes well you will want more of exactly what you sold. Pigment goes into the extrusion, so a second run of the same colour will not be identical to the first. The way round it is to buy the season in one batch and hold the buffer yourself. On a job that will be extended next year — a hotel, a restaurant terrace, a housing scheme phased over two summers — say so at the quotation stage so the whole quantity is run together.
The Decking Range
Capped co-extrusion and classic uncapped, hollow and solid. Six of the sections ordered most often — the full schedule runs to well over a hundred.






The Timber Question, Answered Straight
You are selling into a country that produces excellent softwood and knows how to use it. Any distributor here will be asked why a customer should import a composite board instead, and an answer that runs down timber will lose the room. So here is the comparison as we would actually make it.
What timber does better
It is local, cheaper per square metre, and repairable. A tired timber deck can be sanded and re-oiled and look new; a composite board cannot. Timber is familiar to every installer in the country, needs no special clips, and its supply chain is about as short as a supply chain gets. If the customer enjoys the maintenance, or the budget is tight, timber is a perfectly good answer and we would rather you said so than lost the relationship over one job.
What composite does better
It does not need the annual treatment. That is the whole proposition, and in this market it is worth more than it looks, because the maintenance window is the same narrow window as everything else — the weekend that would have gone on oiling the deck is a weekend in a short summer. It will not splinter, which matters on anything barefoot or with children on it, and it does not need re-fixing as boards cup and twist. Over a fifteen-year horizon the comparison is about labour and weekends, not about the board.
Where composite genuinely needs more care than timber
Two places, and we would rather you heard them from us. It moves more along its length than timber does, so the expansion gaps in the installation guide are not advisory — a timber-trained joiner will under-gap it. And colour is per batch, so a board replaced in year four will not match, where a timber board weathers in. Both are handled by planning rather than by product choice, and both are cheap to get right and expensive to discover late.
What the Board Is Made Of, and How It Reads in Northern Light
Straight from our own catalogue, with nothing rounded up.
60% wood powder, 30% HDPE, 10% additives

That is the whole recipe, and we would rather publish the additive share than print two numbers that do not add up to a hundred. On the capped range a co-extruded shield wraps a WPC core, and the shield is the wearing layer — it carries the fade and scratch resistance, and it is what a steel-edged snow shovel damages. The material can be recycled and reused at end of life, and we hold ISO 14001 alongside ISO 9001; both certificate numbers are in the table further down for anyone whose procurement asks.
Low sun shows everything — choose the texture accordingly

For much of the Swedish year the sun sits low, and raking light is unforgiving — it rakes across a surface and picks out every scratch, every ripple in the substructure and every mark. Two practical consequences: a deeper texture hides wear better than a smooth one under that light, and a substructure that is slightly out of level will show as a shadow line even when the deck is sound. Get the frame flat and choose the grain with the light in mind; ask for samples and look at them outdoors in the evening rather than under a showroom lamp.
Sections and textures

ZSGJ138H23A and ZSGJ138H23C at 138 × 23 mm, ZSGJ138H25 at 138 × 25, ZSGJ140S23 at 140 × 23, ZSGJ140S25 at 140 × 25, ZSGJ145S30 at 145 × 30. Capped surfaces run H1 straight grain and H2, H3 and H5 wood grain; the classic range uses its own codes, so quote the texture with the range. Full schedule with metre weights on the model page.
Colours — Three Ranges
Colour and texture are specified separately from the profile, so a complete specification is three things: model, texture code, colour.
The full colour card

Capped co-extrusion: Teak, Antique, Redwood, IPE, Light-grey, Walnut.
Classic uncapped: Teak, Redwood, Walnut, Coffee, Chocolate, Ebony.
3D embossing: Teak, Red Wood, Walnut, Chocolate, Light Grey, Dark Grey.
Grey is available in the capped co-extrusion range (Antique, Light-grey) and in the 3D embossing range (Light Grey, Dark Grey) — worth knowing early, because a grey brief is a capped or 3D embossed job and should be priced on that basis from the first conversation.
Judge the sample outdoors, in this light
A swatch is an indication, not a match, and northern light makes that worse rather than better: the same board reads warmer under a showroom lamp than it does under an overcast Swedish sky. Ask for physical samples in the two or three you have shortlisted — free, you cover the courier, credited in full against your first order — and look at them outside, at the time of day the deck will actually be used.
Installation and Accessories
From our own installation guide. Put these figures on the drawing before the frame goes down — and in this market, before the ground freezes.
The gaps, and the double joist

5–7 mm between the sides of adjacent boards. About 5 mm between a capped board and a wall. 3–5 mm at butt joints where two board ends meet. Butt joints sit on double joists — each board end gets its own joist, never a shared one, and this is the detail most often missed. Where boards are laid cold — which here means most of the building season — work to the upper end of every range, because the board will be at its shortest on the day it goes down.
Accessories, with sizes

Stainless steel start clip, plastic clip, expansion screw, L-shaped corner trim 50 × 50 × 3000 mm, WPC joist 40 × 30 × 3000 mm, aluminium joist 40 × 25 × 2900 mm. Note the aluminium joist is 2900 mm, not 3000 — an easy hundred millimetres to lose when you take off quantities. On the west coast and the archipelago, specify A4 / 316 stainless for clips and fixings rather than A2.
Ask About a Specific Profile
Send the section, the volume and the season
Per-unit price within 24 hours — not a range. Tell us which season the stock is for and we will work back to the production slot with you.
What Owning the Line Gives You
Capacity you can book against
Roughly 2,000 tonnes a month, about 100 containers. In a market where everyone needs stock in the same eight weeks, the thing that matters is that a repeat order does not queue behind somebody else's. Send the volume and the season; we answer with a slot, not a hope.
Dies are ours, so sections are ours
We own the moulds and cut them in-house. That is why the schedule runs past a hundred sections rather than a catalogue page — and why we can talk seriously about a market-specific profile.
A test report with every shipment
Goods are checked before despatch and the report travels with them. Routine, not negotiated — and it is what makes a warranty claim a paperwork exercise later instead of an argument.
Certification: What We Hold, and the Exact Scope
Swedish procurement verifies, so here is the whole picture including the exact scope — a certificate covering three profiles covers those three profiles. Ask and we send the document itself.
| Item | Status | Detail and scope |
|---|---|---|
| CE marking / CPR | Held, scoped | Certificate M.2024.206.C97619, UDEM International Certification (notified body), EU Regulation 305/2011 Annex V Clause 1.5, valid to 11 March 2029. Issued against EN 15534-1:2014+A1:2017 and EN 14041:2018 for WPC decking, brand Bongywood, profiles 138H23A, 140H25B and 138H23C. Ask before assuming it covers a profile outside that list |
| Reaction to fire, EN 13501-1 | Declared through EN 14041 | EN 14041:2018 requires a reaction-to-fire classification to EN 13501-1, and that class sits on the Declaration of Performance rather than on the certificate. Ask for the DoP for the profile you are quoting and you have the class in writing. The declaration covers the decking profile named on it |
| Surface burning, ASTM E84 | Held, scoped | Class A. SGS report GZIN2404000442CM01-1_EN, 25 April 2024, to ASTM E84-23c: flame spread index 10, smoke-developed index 30. Run on a 138 x 23 mm board, white surface exposed, interior wall and ceiling finish category. This is the US method on the US scale; for a Swedish project the Euroclass on the DoP is the reference |
| ISO 9001 | Held | IAS25924Q1473R0M, valid to 29 April 2027 |
| ISO 14001 | Held | IAS25924E0394R0M, valid to 29 April 2027. Worth naming in a procurement response alongside the recyclability of the material |
| Slip resistance | Held, scoped | R10 under AS 4586-2013 Appendix D, Intertek report 230625005SHF-001, ramp method at 15 degrees, on profile ZSGJ138H23A. That is the SHOD wet method — the number that applies to a surface walked in shoes. Barefoot wet areas are assessed by a separate method with its own scale, so tell us which one your project has to satisfy |
| REACH | Declaration only | Manufacturer declaration of conformity, issued by us |
Get the Documents Themselves
Nothing above is a claim you have to take on trust. Tell us which documents your project needs and we will send the PDFs — certificate, Declaration of Performance with the reaction-to-fire class, the laboratory reports, the ISO certificates and the warranty schedule.
Request the certificates and test reports
What We Do for a Distributor
A first order can be well under a container
Minimum order is 70 m². In a short-season market that matters more than it does elsewhere — it lets a new distributor test a colour, a profile and our paperwork on one real job instead of betting a season on us.
Samples are free
You pay the courier and we credit it in full against your first order. Ask for a sawn sample: the cut end shows whether the cap runs all the way round the section or stops at the sides. And look at the samples outdoors in evening light before you decide — see the note on northern light above.
A real number within 24 hours
Send the specification and the volume, get a per-unit price rather than a range. We need: profile, colour, quantity in m², discharge port, and the season the stock is for.
Private label, market-specific sections, testing on your profile
All three are conversations. We own the tooling, we already run sections cut for particular export markets, and where a project needs a test our documents do not cover we will put your profile through the laboratory — fee up front, credited against the order. Every result we send you names the profile it was measured on.
Sweden: Route, Transit and Terms
Loading is Nansha or Yantian, both in Guangdong, both within trucking distance of the plant.
| Item | Detail |
|---|---|
| Port of loading | Nansha or Yantian, Guangdong |
| Main discharge port | Gothenburg — the largest port in the Nordics and the usual call for deep-sea services |
| Beyond Sweden | Gothenburg also feeds Norway, Denmark and Finland by road, rail and feeder. If you distribute across the Nordics, say so when you enquire and we will quote the programme rather than the pallet |
| Other options | Malmo and Helsingborg for the south, Stockholm for the east coast; several services tranship at a North Sea hub |
| Transit time | About 50 days port to port. Sea time only; production is separate and confirmed against your volume when we quote |
| Planning rule of thumb | Sea time plus production means an autumn order is spring stock. Tell us the season, not the date |
| Import duty | No EU anti-dumping duty applies to our WPC products. Confirm the current tariff line with your own broker before quoting a landed price |
| Quantity per container | Quoted per order with the profile mix, because metre weight varies by section |
| Minimum order | 70 m² |
| Samples | Free; you cover the courier, credited against the first order |
| Quotation turnaround | Within 24 hours, per unit |
The Freeze Is the Easy Part — the Thaw Is the Test
Specific to Sweden, and deliberately different from our Polish page. Poland is about the width of the annual swing. Sweden is about how long the deck spends under snow and what happens in the weeks when it comes off.
Frozen solid is a stable condition; thawing is not
A deck under a metre of settled snow in February is in a fairly benign state — cold, dry, stable. The damage happens in the thaw, when meltwater runs into every gap and then refreezes overnight, night after night. Water that has somewhere to go is harmless. Water that has nowhere to go turns into ice and lifts a board. Composite does not take up water the way timber does, so the board is rarely what fails — the drainage is.
Which makes drainage the specification that matters most
Three things, all of them decided before the boards go down: fall on the substructure so meltwater leaves, board gaps kept clear at 5–7 mm so it can get through, and a perimeter that is not sealed tight, so the deck never becomes a tray. Set the gutter detail the installation guide calls for at the base. A deck built flat and closed in will survive one winter and complain about the second.
Snow load belongs to the frame, not the board
Settled snow on a raised deck is a structural question for whoever designs the substructure. Give them the metre weight for the profile you are buying and let them do the arithmetic — it is on the model page, and it runs from 2.00 to 7.27 kg/m across the schedule, so it is not a number to guess at. We put the figure for your profile in writing with the quotation.
Clearing it: plastic blade, push rather than chop
This is the complaint that comes back to you rather than to us. A steel-edged shovel dragged across a composite deck scratches the shield, and on a capped board the shield is the wearing layer. Say it at the point of sale: plastic blade, push rather than chop, and leave the last few millimetres to melt. It costs nothing to mention and it is expensive to argue about in April.
Salt and grit attack the fixings, not the boards
De-icing salt tracked onto a terrace concentrates as the water dries. The composite handles it. Screws, clips, joist hangers and post bases do not — and that is exactly where nobody looks until the deck has to come up. Specify the fixing grade at quotation rather than leaving it to site, and on the west coast or in the archipelago make it A4 / 316.
Jetties, Lakesides and Anywhere Wet Underfoot
Sweden has a great deal of water and a lot of decking ends up beside it, so the slip question comes up early. The useful answer is about method rather than adjectives.
What our result is
R10 under AS 4586-2013 Appendix D, ramp method at 15 degrees, Intertek report 230625005SHF-001, measured on profile ZSGJ138H23A. That is the shod wet method — the number that describes a surface walked in shoes, which is most of the Swedish year. It belongs to that profile and that method, and we will send the report so your own technician reads the scope on its face.
Barefoot wet areas use a different method and a different scale
A jetty in July is a barefoot surface, and barefoot wet areas are assessed by a separate method against its own classification — a figure from one does not convert into the other. Establish which one your project or your client's insurer is asking for, then ask us for the report that matches it. Bring us the requirement and we answer it with a document rather than an adjective.
Three Things That Go Wrong When Europeans Import WPC
Not sales copy — these are the three that cost distributors money.
The frame is set out for timber
Especially likely here, where every installer has spent a career on timber. Composite has a maximum support spacing and it is tighter than timber. Get the figure for your profile in writing and put it on the drawing before the frame goes down. Wrong, and the deck does not collapse — it flexes underfoot permanently, and under low raking light the deflection shows as a shadow line long before anyone feels it.
The end gap gets left out
The most expensive of the three, because a buckled deck is a full relay with no partial fix. And it is more likely here than almost anywhere, because boards laid on a cold day are at their shortest — a gap that looks generous in May is the minimum in August. Work to the upper end of the range.
Batch colour is not matched later
Pigment goes into the extrusion, so two runs of the same colour will not be identical. Buy the season in one batch and keep the buffer. A board replaced in year four will not match — ours or anybody else's — and this is the one place where timber genuinely behaves better, since a replacement plank weathers in.
Warranty, and How a Claim Works
Stepped, not flat
Capped co-extrusion carries 15 years, classic uncapped 10. Both step down by year rather than paying full value throughout: 100% of the value of the affected goods in years 1–3, then 80, 70, 50 and 40% through years 4 to 7, then reducing in bands to 10% in the final years. It covers peeling, cracking and overall uneven fading.
It starts at the destination port
Cover runs from the date the goods arrive and are signed for at the port — not our factory gate, and not the day your customer installs them. In a market where stock often lands a season before it is laid, that difference is worth reading twice, and it works in the distributor's favour.
Certificates are per batch
The schedule that applies is the one on that batch's certificate, which is why the test report shipping with the goods matters. Keep it with the commercial paperwork. If a supplier quotes you a flat 25 years, ask for the schedule — the answer tells you more than the number.
Talk to Us About Sweden
The full enquiry, if you would rather send everything at once. Tell us which season the stock is for — it is the single most useful thing in the message. You will hear back within 24 hours with a real per-unit price.
Distributor and project enquiry
Sweden: Common Questions
Season, stock and commercial
How far ahead do we need to order?
Think in seasons rather than weeks. Transit is about 50 days port to port and production runs before that, so an order placed in autumn is stock on the ground for spring, and one placed in April is realistically stock for the following year. Tell us which season you are buying for and we will work backwards to the production slot with you.
What is the minimum order for Sweden?
70 m². In a short-season market that matters more than elsewhere: it lets you test a colour, a profile and our paperwork on one real job rather than betting a season on a new supplier. Freight per unit improves as you approach a full 40HQ, but you do not have to start there.
Can we serve Norway, Denmark and Finland from Swedish stock?
Yes, and Gothenburg is set up for exactly that — it is the largest port in the Nordics and feeds the neighbouring markets by road, rail and feeder. Tell us the onward markets when you enquire. It changes nothing about the goods but it does change how the documentation is set up, and it means we quote the programme rather than a single parcel.
Is there an anti-dumping duty on Chinese WPC into the EU?
No EU anti-dumping duty applies to our WPC products. The standard tariff line still applies, so confirm the current rate with your own customs broker before quoting a landed price — rates and classifications change and yours is the one that governs.
Do you do private label?
Ask us. We own the tooling and already run sections cut for particular export markets, so both private label and a market-specific profile are conversations we are ready to have.
Winter, timber and specification
Will the boards survive a Swedish winter?
The frozen months are the easy part — cold, dry and stable. What tests a deck is the thaw, when meltwater runs into every gap and refreezes overnight. Composite does not take up water the way timber does, so the board is rarely what fails; the drainage is. Fall on the substructure, board gaps kept clear at 5–7 mm and a perimeter that is not sealed tight will handle it. A deck built flat and closed in will survive one winter and complain about the second.
Can we clear snow off it?
Yes, with a plastic-bladed shovel, pushing rather than chopping, and leaving the last few millimetres to melt. A steel edge dragged across the surface scratches the shield, and on a capped board the shield is the wearing layer. It is worth saying to the customer at the point of sale rather than in April. Snow load itself is a question for whoever designs the substructure, not for the board.
Why would a customer here choose composite over timber?
Because it does not need the annual treatment, and in this country the maintenance weekend is a weekend in a short summer. It also will not splinter, which matters barefoot and with children. Timber is cheaper per square metre, local, and repairable by sanding — all real advantages, and if the customer enjoys the upkeep or the budget is tight, timber is a perfectly good answer. Over fifteen years the comparison is mostly about labour, not about the board.
Where does composite need more care than timber?
Two places. It moves more along its length, so the expansion gaps are not advisory — a timber-trained installer will under-gap it, and boards laid cold are at their shortest. And colour is per batch, so a board replaced in year four will not match, where a replacement timber plank weathers in. Both are handled by planning rather than product choice.
What are the installation gaps?
5–7 mm between the sides of adjacent boards, about 5 mm between a capped board and a wall, and 3–5 mm at butt joints where two board ends meet. Butt joints sit on double joists — each board end on its own joist, never shared. Where boards are laid cold, which here means most of the building season, work to the upper end of every range.
What joist spacing do the boards need?
It is per profile and per grade, and we give it in writing with the quotation. Our own catalogue shows the span changing by a third or more between grades for the same section, which is exactly why a single published figure would mislead you. Do not carry a timber figure across — that is the most common mistake in this market.
What slip rating do the boards have?
R10 under AS 4586-2013 Appendix D, ramp method at 15 degrees, Intertek report 230625005SHF-001, measured on profile ZSGJ138H23A. That result belongs to that profile and that method — shod and wet, on the ramp. A jetty in July is a barefoot surface, and barefoot wet areas are assessed by a separate method against its own scale, so tell us which one your project has to satisfy and we will send the report that matches.
What can we tell a procurement officer about environmental credentials?
We hold ISO 14001 (IAS25924E0394R0M, valid to 29 April 2027) alongside ISO 9001, the board is 60% wood powder and 30% HDPE with 10% additives, and the material can be recycled and reused at end of life. Ask us for whichever documents the tender asks for and we will send the ones we hold, named and numbered, so your response quotes certificates rather than adjectives.
Autumn order = spring stock · Factory direct from Guangdong · CE / CPR M.2024.206.C97619 under EN 15534-1 and EN 14041 · ISO 9001 & 14001 · Own dies, own compounding · MOQ 70 m² · About 50 days to Gothenburg · Test report with every shipment · Trade buyers only